吊顶除湿机正确的安装方法?

2022-01-14 15:28

吊杆安装,安装前,要确定安装位置,在确定的安装位置用粉笔及量具进行准确定位后,再用钻机在确定好的位置上钻孔,打上膨胀螺杆,螺杆规格不小于M8。

Before the installation of suspender, the installation position shall be determined first. After the determined installation position is accurately positioned with chalk and measuring tools, the drill shall be used to drill holes at the determined position and hit the expansion screw. The screw specification shall not be less than M8.

除湿机安装,在除湿机安装之前需在四根膨胀螺杆上分别依次装入四套M8螺母1,弹垫,平垫,再将除湿机水平向上移,以将膨胀螺杆穿入除湿机吊耳,再分别旋入一颗螺母2将除除机安装在膨胀螺杆上,需注意除湿机在任何位置都不得倒置,否则除湿机将会损毁。

For the installation of dehumidifier, before the installation of dehumidifier, four sets of M8 nuts 1, elastic pad and flat pad shall be installed on the four expansion screws respectively, and then move the dehumidifier horizontally upward to thread the expansion screw into the lifting lug of dehumidifier, and then screw in a nut 2 respectively to install the dehumidifier on the expansion screw. It shall be noted that the dehumidifier shall not be inverted at any position, otherwise the dehumidifier will be damaged.

水平安装,除湿机装好后调整固定螺母,可用水平尺检测,以使机身达到水平安装,(以此保证除湿机可以正常出水,避免漏水隐患),比较后螺母装除湿机锁紧,此时完成除湿机的安装。

Horizontal installation, dehumidifier installed after adjusting the nut, can be detected with a horizontal ruler, so that the body to achieve horizontal installation, (so as to ensure that the dehumidifier can be normal water, to avoid water leakage), and finally nut installed dehumidifier locking, and then complete the installation of dehumidifier.

排水管的安装,除湿机应高于排水管路5-250px,排水软管长度根据实际情况来确定,但是请确保排水畅通。公司生产的吊顶除湿机既可以吸顶安装,也可悬挂安装。安装完成后要便于维护,空气循环流通。

For the installation of drainage pipe, the dehumidifier shall be 5-250px higher than the drainage pipe. The length of drainage hose shall be determined according to the actual situation, but please ensure smooth drainage. The ceiling dehumidifier produced by the company can be either ceiling mounted or suspended. After installation, it shall be convenient for maintenance and air circulation.

进风管安装,进风口与机身应尽量接近,与除湿机本身的进风口高低位差尽量小,进风管道越短,除湿效果越佳。进风管比较长不可超过1.5m,与除湿机进风口需紧密连接(进风口前方不得有障碍物)。

For the installation of air inlet pipe, the air inlet shall be close to the machine body as far as possible, and the high-low level difference with the air inlet of the dehumidifier shall be as small as possible. The shorter the air inlet pipe, the better the dehumidification effect. The maximum length of the air inlet pipe shall not exceed 1.5m and shall be closely connected with the air inlet of the dehumidifier (there shall be no obstacles in front of the air inlet).

出风管安装,出风口与机身的间距应尽量远离,但出风管比较长不宜超过5米,与除湿机本身的出风口高低位差尽量小,与除湿机的出风口需紧密连接(出风口前方不得有障碍物)。

For the installation of air outlet pipe, the distance between the air outlet and the machine body shall be as far as possible, but the maximum length of the air outlet pipe shall not exceed 5m, the difference between the height and low position of the air outlet of the dehumidifier shall be as small as possible, and it shall be closely connected with the air outlet of the dehumidifier (there shall be no obstacles in front of the air outlet).